The monitoring type “midi” is suitable for medium systems. Up to five particle counters and other sensors can be connected to the system.


Packaging Unit:  Piece
€40,250.00

Monitoring Type Midi

Monitoring Midi

Packaging Unit: Piece


General description

The monitoring type “midi” is suitable for medium systems. Up to five particle counters and other sensors can be connected to the system.

The monitoring system can be used for various locations. Whether in cleanrooms, storage halls or technical rooms, the system registers all data from particle counters, environmental sensors and other devices and machines. This data is registered on the customized software application, compared with limits and archived. If the limits are exceeded, corresponding messages are sent and alarms activated.

The system contains the following components:

  • Switch cabinet incl. electronics
  • Particle counters incl. vacuum supply
  • Environmental sensors
  • Alarm system
  • PC system incl. software
  • Final assembly, commissioning and training
  • Qualification
  • Various options

 

The system can be extended and customized solutions are available at any time. Please do not hesitate to contact us for a specific offer.

1        Hardware monitoring system

1.1       MOD box systems

Registers, converts and transmits measured values of the external 4…20 mA signals and the relevant circuits to the DLS PC. The MOD box system is completely assembled and wired on the inside. The MOD box system is built as wall switch cabinet with the following measurements: 800 x 600 x 300 mm.

Consisting of:

  • Modbus controller unit / RS485 / Modbus interface for computer communication
  • Connection of all relevant field sensors for the corresponding area
  • 8 analogue inputs
  • 4 digital inputs
  • 8 digital outputs
  • Incl. watch dog function
  • Incl. two potentially free contacts for alarm forwarding
  • Incl. data interface for data retention
  • Incl. USV
  • Incl. hose feed-through / sockets
  • Cable feed line from the top of the enclosure

 

Quantity:                                                                                                                                       1 piece

1.2       Particle counter

Ultra-compact stainless steel enclosure as standalone unit with external vacuum pump for the continual point-of-use usage.

  • 2 particle channels ³ 0.5mm & ³ 5.0mm
  • Modbus protocol / Ethernet
  • Flow rate: 1 CFM (28.4 l/min)
  • 24 VDC external power source
  • Incl. flow monitoring
  • Incl. factory calibration
  • Incl. user manual
  • Incl. directly attached isokinetic probe
  • Incl. wall mounting clip for particle counter
  • Incl. 3 meters of bev-a-liner hose
  • Incl. monopod/wall mounting for isokinetic probe

 

Quantity:                                                                                                                                         3 pieces 

1.3       Vacuum pumps

Stand-alone rotary slide vacuum pumps to generate the required vacuum, incl. entire substructure to connect to the 230 VAC network using a SCHUKO connector (power cable ca. 3 meters).

Recommended: Install in intermediate ceiling area or rather close to the connected particle counter (up to max. 25 meters distance)

  • Electric motor connected and air-cooled in the block (230 VAC/50Hz)
  • Incl. pump pre-filter on suction side
  • Incl. back filter and recirculation to the ventilation system
  • Incl. no-return valve on pressure output side (protection against return flow)
  • Incl. temperature monitoring (overheat protection)
  • Incl. vacuum monitoring directly at suction
  • Incl. 25 meters of vacuum hose

 

Quantity:                                                                                                                                       3 pieces

1.4       Differential pressure sensors

  • Range DP:                                               -50 to 50 Pa (alternatively -100 to 100 Pa)
  • Output signal:                                          4-20mA
  • Accuracy:                                               ±0.5 Pa
  • Auxiliary power:                                     24 VDC
  • Completely integrated into switch cabinet
  • Incl. factory calibration
  • Incl. hose nozzle
  • Incl. 50 meters of hose

 

Quantity:                                                                                                                                     5 pieces 

1.4.1      Temperature and humidity sensors

  • Temperature range:                                0 to 50°C; ± 0.2 °C
  • Humidity range:                                       0 to 100%rF; ± 2%rF
  • Output signal:                                          4-20mA/Modbus
  • Auxiliary power:                                     24 VDC
  • Incl. ceiling/wall mounting kit
  • Incl. factory calibration

 

Quantity:                                                                                                                                       3 pieces 

1.5       Alarm lamps

Alarm lamps with continuous light, with LED modules for ceiling mounting, incl. connection kit. The LED modules are controlled by the vali.mon software. Depending on the alarm status, they either blink (alarm pending/not confirmed) or shine continuously (alarm pending/confirmed).

  • Lamp colors: red and green
  • Horn (automatically turns off after 15 min)

 

Quantity:                                                                                                                                       3 pieces 

1.6       Computer system

  • HP computer (latest generation), 1. HDD 500 GB / 4 GB RAM
  • 2. HDD 500 GB with corresponding RAID-1 controller unit
  • VGA/DVI/HDMI video card
  • Midi tower casing with keyboard and mouse
  • 2 PCI slots and ports: 1 serial, 4 USB
  • CDRW 48x/24x/48x drive
  • 1 TCP/IP network cards ETHERNET
  • WIN 7/8/10 workstation license incl. manual and documentation
  • RAID-1 built in, configuration, installation and function test
  • Pre-installed with all relevant components
  • 1 HP 24“ LCD-Monitor; 1920*1080 resolution
  • Incl. USV (for ca. 15 min) and communication module

 

Quantity:                                                                                                                                    1 system 

2        Software and software applications

2.1       SCADA monitoring software (21 CFR P11 regarding eR & AT)

enVigil run time version, state-of-the-art system process control and and data acquisition software (SCADA), with full access to the WIN technology.

Consisting of:

  • 21 CFR Part 11 compliant run time version for 100 I/O points
  • Electronic records (eR) and audit trail functions (AT)
  • All necessary drivers
  • User management system
  • Report generator for real time/historical trend and reports
  • Data logging and data archiving module
  • High-functional animation tool kits, etc.
  • Limit exceeding module (alert/alarm)
  • 100% WIN compatible
  • OPC interface
  • 1 CD ROM incl. manuals in English

 

Quantity:                                                                                                                                    1 license 

2.2       SCADA application

Creating the applications on the above mentioned SCADA software with all necessary I/O devices, FDA compliant data base structures, report generators, visualization structures, data registering and data back-up routines, access structures and threshold logic. All customized modules are included, e.g.:

  • System driver and data transfer module
  • Analogue system inputs
  • Digital system inputs and outputs
  • Limits and event notification and logic shortcut
  • Complete historical report and historical trend structure
  • Alarm report “on screen” and “as print”
  • Data backup concept and “reload” module
  • Measuring data logger for online data backup
  • Measuring data import and export function
  • Audit trail functions
  • Incl. 1 overview picture and 5 detailed pictures
  • Incl. manual in English

 

Quantity:                                                                                                                                       1 piece 

3        Engineering / preparatory work

  • Concept, planning, preparation of documents for documentation folder
  • Draw up basic layout and MSRE charts
  • Correspondence (written and by phone) with customer and third parties
  • Determining and coordination of installations
  • Determining working interfaces with third parties
  • Draw up cable laying lists and the corresponding material lists for assembly firms commissioned by the customer
  • Folders “Technical documentation 1 and 2”

 

4        Final assembly

  • Connection of the previously laid signal cables to the delivered sensors and other system components
  • Connection and arrangement of all the previously and externally laid signal and interface cables to the Mod box unit
  • Connection and arrangement of the previously laid interface cable
  • Connection of all devices delivered by vali.sys to the prepared 230VAC sockets according to the cable list, using the delivered 230VAC device cable (vacuum pumps)
  • Labelling all relevant elements and devices
  • Excl. basic assembly (price upon request)
  • Excl. cable laying (price upon request)

 

5        Commissioning and training

5.1       Commissioning

Entire commissioning of the mentioned components after they had been laid and attached by the customer according to our cable list and cable laying charts as well as connected on both sides by vali.sys (final assembly/connection). 

5.2       Training

User training with the future system user team. Training by our specialist for clean room monitoring systems.

  • Preparation of training documents
  • Preparation of attendance protocols
  • Training and completing protocol
  • Training of the involved and authorized employees:
  • User
  • Service personnel
  • System supervisor

 

6        Prospective qualification of the computerized system

This prospective qualification of the computerized system is carried out for the entire delivered system.

6.1       Functional design specification (FDS)

Definite description of the monitoring system functions based on the customer’s user requirement specification (URS).

The FDS contains the released specifications, plans and descriptions. The FDS includes the following:

  • HDS – hardware design
  • SDS – software design
  • FDS – function design

 

6.2       IQ protocol

Preparing all relevant documents for the installation qualification for the monitoring system and the installed software according to the GAMP requirements. The installation qualification is documented proof that the system was installed according to its specifications and requirements. Usually, the IQ starts after termination of the entire assembly. The installation needs to be verified including the GMP criteria and the conformity of the required specifications. All IQ tests are carried out based on approved test protocols. The testing person directly documents the results in the IQ test protocols.

The IQ includes the following:

  • Documentation qualification
  • Qualification of the software availability
  • Installation qualification of the DLS PC
  • Installation qualification of the USV
  • Installation qualification of the MOD box
  • Installation qualification of the sensors
  • Installation qualification of the alarm systems
  • Qualification of the fuses
  • Qualification of the wiring and cables
  • Qualification of the software configuration
  • Line test

 

6.3       OQ protocol

Preparing all relevant documents for the operation qualification for the monitoring system and the installed software according to the GAMP requirements. The aim of the operation qualification is to give documented proof that the system functions according to its determined requirements. The OQ is carried out under supervision of an employee of the customer. All OQ tests are carried out based on approved test protocols. The testing person directly documents the results in the IQ test protocols.

The OQ protocols include the tests of the following components:

  • PC start
  • Log-in/Log-out
  • User rights
  • Password security
  • Real time animation
  • Particle counter function
  • Operating mode
  • Sensor alarms
  • Alarm systems
  • Real time trend
  • Real time report
  • Historical trends
  • Historical reports
  • Historical alarm reports
  • Audit trail
  • Various settings (calibration date, operating hours, etc.)
  • Data backup and data recovery
  • USV
  • WatchDog

 

6.4       Carry out IQ

Carrying out all relevant examinations for the installation qualification of the monitoring system by using the protocol and the required additional documents according to GAMP, incl. qualification of the installed software. 

6.5       Carry out OQ

Carrying out all relevant examinations for the operation qualification of the monitoring system by using the protocol and the required additional documents according to GAMP, incl. qualification of the installed software. 

6.6          Writing the QMP (qualification master plan)

The purpose of the QMP is to correctly document the planning, installation and operation of the monitoring system according to the URS and the relevant SOPs. This plan regulates the responsibilities and processes concerning the qualification of the monitoring system. 

6.7          Carry out risk analysis

The purpose of this risk analysis is to quickly identify possible errors and dysfunctions and to evaluate their risk. The analysis is done in three steps: potential error (A), error cause (B) and effect (E). Each one is rated from 1-10. Finally, there results a risk priority number which is calculated as follows: A * B * E. The risk evaluation is done for the monitoring system only. 

6.8          SOP

  • Operating instructions for operator/supervisor
  • Operating instructions for manager
  • Disaster Recovery

  

7        Options

7.1       Particle counter

Ultra-compact stainless steel casing as stand-alone unit with external vacuum pump for continuous point-of-use application:

  • 2 particle measuring channels ³ 0.5µm & ³ 5.0µm
  • Modbus protocol / Ethernet
  • Flow rate: 1 CFM (28.4 l/min)
  • 24 VDC external power supply
  • Incl. flow monitoring
  • Incl. factory calibration
  • Incl. user manual
  • Incl. directly put on isokinetic sample probe
  • Incl. wall mounting clip for particle counter
  • Incl. tube with special coating (3 meters)
  • Incl. monopod / wall mount for isokinetic sample probe
  • Incl. vacuum pump with hose (25 meters)
  • Incl. expansion of I/O system
  • Incl. integration into software
  • Incl. adaptation of documentation and qualification
  • Incl. additional costs for final assembly

 

7.2       Differential pressure sensors

  • Range DP:                                               -50 to 50 Pa (alternatively -100 to 100 Pa)
  • Output signal:                                          4-20mA
  • Accuracy:                                               ± 0.5 Pa
  • Auxiliary power:                                     24 VDC
  • Completely integrated into switch cabinet
  • Incl. factory calibration
  • Incl. measuring nozzle for clean room ceiling
  • Incl. hose (50 meters)
  • Incl. expansion of I/O system
  • Incl. integration into software
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.3       Temperature-humidity sensors

  • Temperature range:                                0 to 50°C; ± 0.2°C
  • Humidity range:                                       0 to 100%rF; ± 2%rF
  • Output signal:                                          4-20mA/Modbus
  • Auxiliary power:                                     24 VDC
  • Incl. ceiling/wall mount kit
  • Incl. factory calibration
  • Incl. expansion of I/O system
  • Incl. integration into software
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.4       PT100 temperature sensors

Pt100 temperature sensors incl. transmitter (wall sensor unit) up to -70°C

  • Temperature range for transmitter:                              -100°C to + 100°C
  • Temperature range for PT-100 sensors:          -70°C to + 500°C (bar or cable)
  • Accuracy:                                                                     ± 0.1°C, PT100 Class A
  • Auxiliary power transmitter:                                         12-30 VDC
  • Incl. mounting kit
  • Incl. factory calibration
  • Incl. expansion of I/O system
  • Incl. integration into software
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.5       Alarm lamp

Alarm lamps with continuous light, with LED modules for ceiling mounting, incl. connection kit. The LED modules are controlled by the vali.mon software. According to the alarm status, they either blink (alarm pending/not confirmed) or shine continuously (alarm pending/confirmed).

  • Lamp colors: red and green
  • Horn (automatically turns off after 15 min)
  • Incl. expansion I/O system
  • Incl. integration into software
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.6       Printer HP LaserJet Pro color printer

  • 1 Hi-Speed USB 2.0
  • 1 Fast Ethernet 10/100Base-TX
  • HP ePrint, Apple AirPrint™
  • HP ePrint functionality
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.7       Client computer system

  • HP computer (latest generation), 1. HDD 500 GB / 4 GB RAM
  • 2. HDD 500 GB with corresponding RAID-1 controller unit
  • VGA/DVI/HDMI video card
  • Midi tower casing with keyboard and mouse
  • 2 PCI slots and ports: 1 serial, 4 USB
  • CDRW 48x/24x/48x drive
  • 1 TCP/IP network cards ETHERNET
  • WIN 7/8/10 workstation license incl. manual and documentation
  • RAID-1 built in, configuration, installation and function test
  • Pre-installed with all relevant components
  • 1 HP 24“ LCD-Monitor; 1920*1080 resolution
  • Incl. USV (for ca. 15 min) and communication module
  • Incl. client license
  • Incl. client application
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.8       NAS for data backup

  • Network-attached storage with 2 x 1TB, Raid 1
  • Integrated into switch cabinet
  • Incl. switch
  • LAN connection
  • With USB 3.0
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

7.9       GSM modem

System to forward predefined limit exceeding (alarm) to various recipients (by text message)

  • GSM modem for alarms
  • Alarm and data forwarding by OPC
  • Alarm forwarding
  • Incl. configuration, installation and operation test
  • Incl. adaptation documentation and qualification
  • Incl. extra costs final assembly

 

Requirement: The customer has to provide a SIM card of a mobile phone provider. Furthermore, the modem needs to be installed where there is good reception (only if text message and voice options are used).

7.10    FAT (factory acceptance test)

  • Prepare the FAT documentation
  • Assemble the system components relevant for the FAT
  • Conduct the FAT in our factory
  • Disassemble the relevant system components and prepare for distribution
  • Short description:
  • The FAT is assembled with all possible components. Where it is not possible (for technical reasons) to use the original devices, the corresponding signals are simulated. Furthermore, all relevant software functions are tested. The FAT is carried out in two steps: Firstly, the operation of the particle counters is tested. Secondly, the remaining sensors and all functions and evaluations are tested.

 

7.11    MKT (mean kinetic temperature)

  • Evaluation for storage areas
  • Incl. adaptation of documentation and qualification

 

Agreement

Our prices are net prices, calculated incl. one journey in Germany, Austria or Switzerland (journey there, stay, journey back) with continuous completion of all positions stated in this offer. Additional working time, waiting time (caused by customer or third parties), travel time, travel expenses, accommodation and food are billed separately according to receipts.

This document is based on the following preconditions:

All tubes/transmission routs and drillings necessary for cable laying, hose laying and tube laying are done by the customer or the customer’s electrician on-site. All necessary building material (unless the components are mentioned in this offer) has to be provided by the customer or the customer’s electrician according to the specifications and cable lists provided by vali.sys.

All components installations (cable connection, etc.) are done by vali.sys gmbh or an electrician or mechanic on-site. Excluded are the following: fixing of machines and sensors, drillings for machines and/or workbenches, wall cutouts in already existing clean room walls, etc. These have to be done by the customer or the customer’s electrician on-site. 

Excluded from the price calculation:

  • Wall drillings for signal and interface cables
  • Providing the 230 VAC main supply for the entire system
  • Cable protection tubes and cable channels for signal cable laying as well as fire covering elements
  • Opening and closing wall and ceiling elements
  • All not explicitly mentioned tasks mentioned in this offer

 

These additional tasks are billed separately according to the current work fees.

Delivery time:

Ca. 8 weeks upon receipt of written order and receipt of signed and thus valid URS. Definite cable lists and drafts are available 4 weeks upon written order.